Wednesday, October 7, 2009

Meeting Nine - Filming


On Saturday 3rd we went to Thorndon Park to film part of our music video. This part was for the performance side and the singer. We made sure the costume matched the theme and feeling of the song.
It was a very pretty location and was key to what he had in mind. We made sure that the filiming took place in the morning so that the light was high key, which enable the picture quality to look better and more of a high standard. Although it didnt rain it was very windy which made it harder for us to get the right shots. Hair was getting in peoples eyes and clothes were flying back due to the stronge wind.
Within Thorndon park we filmed at 3 different parts. The main part of the filming took place on a log with the background being a lake. Here we filmed the start of our music video as well as the main bulk of the performance part.We then moved on to a bridge type part within the park where it was covered over with tress. Here we done another take of the video where we will be diping into during the video.
We then brought it to school and capture what we had got and started to edit the beginning part of the song. With little of the song covered, more filiming is needed and we plan to start filiming the narration part tomorrow and come back to the performance part after.

No comments:

Post a Comment